Rewa-Sidhi  New Rail Line Project

Extension of Portal at Tunnel No. 03 (Portal 02) through construction of Cut & Cover, Precast RCC Drains in Sidhi Station Yard, protection of slopes of cutting and inside surface of Tunnel No. 01 through rock bolting, wiremesh and shotcreting at different locations and other miscellaneous work in Churhat – Sidhi section in Rewa-Sidhi New Rail line project.